Posted 6/15/2024 05:50 (#10775031 - in reply to #10775030) Subject: RE: Blocked ditch absentee landowner Minnesota?
South Central Illinois
CRP enrollment should not be stopping the water flow. How much work needs done? Looks like close to a quarter mile in length. How deep and wide does it need to be?