|
| They were putting bent and scratched sheets on mine. They didn't want to stop. I finally got a hold of the guy who sold the building. It didn't seem to bother him either.
One needs to have the plans for the building in hand and stand there the whole time it is under construction.'
I bough my building with the understanding a very good local guy would do the work. After I signed I was told they would get what ever crew together they could.
Tin was put up that was covered in mud. Both sides so some is in the walls and ceiling. No one seems to know how many screws were supposed to be in each sheet. ETC. | |
|