Posted 8/15/2015 09:11 (#4734181 - in reply to #4734141) Subject: RE: A little extra pull this week.
Pedee, Oregon
We were pre-ripping, took 2 or 3 pre-passes for the 8400 to pull tile in on grade. This one was a bit complicated so we just wanted to put it in on grade and be done with it. The low point is where the short piece of tile is laying, loses 2' from where the start pit is, doesn't look like it.