Chilliwack BC Canada | We are planning on putting a T and valves in the discharge line of the pump we use to pump out the under barn channel to direct the manure to Slurrystore as needed. We are going to have a Houle pump on the side to agitate with nozzles on the inside. We will have a valve on the discharge of that pump as well and unload the Slurrystore into the existing pit so we can haul out of it. The new pit will only be used in the winter and we only expect to fill and empty it once a year. We will probably get a custom operator in with a draghose in the spring cuz we will have 900,000 gal. When they both will be full. That will be 450 loads with our little tank and will just take too long. | |
|