Posted 3/5/2012 10:17 (#2268915 - in reply to #2268787) Subject: Re: Would You Build Another Bin?
IA
I should have said he is not able to run the grain setup in the fall. I also didn't mention that I do the drying too, with his dryer. He covers all costs associated with that.