AgTalk Home
AgTalk Home
Search Forums | Classifieds (131) | Skins | Language
You are logged in as a guest. ( logon | register )

AGPS question for NCook
View previous thread :: View next thread
   Forums List -> Precision TalkMessage format
 
VWBuckeye
Posted 8/22/2011 23:16 (#1925415)
Subject: AGPS question for NCook


Ohio
Hey Nate,
We purchased AGPS Pipe Pro this year from you and we love it so far. Have ran a 30 acre farm this summer with a Waynes plow and your system. We are looking at purchasing a wheel machine to add to our tile install fleet and I know you can use AGPS Pipe Pro on wheel machines, but I was curious as to how guys drop in at the main and begin the run away from the main. It's not neccesary to dig a start hole is it? I know our local guy with a wheel machine starts the run a little bit behind the main at ground level and begins digging the wheel in and by the time he is past the main he dug just over it and is now ready to string the tile into the machine and boogie. I figure I could start that same way and stop just after the machine clears the main and hit the design button and then let AGPS do the grading. I was curious as to what you have seen guys with wheel machines do when running AGPS. Just making sure I am not missing anything here when it comes to putting the system on the wheel.
Thanks Nate
Top of the page Bottom of the page


Jump to forum :
Search this forum
Printer friendly version
E-mail a link to this thread

(Delete cookies)