AgTalk Home
AgTalk Home
Search Forums | Classifieds (35) | Skins | Language
You are logged in as a guest. ( logon | register )

Required Minimum ROI on Tiling
View previous thread :: View next thread
   Forums List -> Crop TalkMessage format
 
4WD
Posted 2/28/2021 19:31 (#8864605 - in reply to #8864552)
Subject: RE: Required Minimum ROI on Tiling


Between Omaha and Des Moines, 7 miles South of I80

All hired done, with chain trencher = too many little old clay tile lines (some are 2" to 2.5" diameter hand dug style), that you can run into on these old farm fields.

 Trencher operator "flags" when he sees clay chucks come up, and then they go back, with backhoe, and tie those old clay tiles, into the new 5" or 6" plastic tile.

 

I don't see how a "tile plow" would work properly, on these types of fields, without a bunch of tile holes, the next year. 

Top of the page Bottom of the page


Jump to forum :
Search this forum
Printer friendly version
E-mail a link to this thread

(Delete cookies)