| So I’m making corners out of 2 3/8 pipe. I’ve been plunging them about 3.5’, throwing a bag of cement in the hole and putting dirt in the top 10” ish.
Right now it’s very wet. I drove some extra posts I didn’t really think I needed with a hand post driver. I can drive by hand about 3 foot in the ground. How much weaker will they be just drove instead of cemented?
If I’m putting 3 posts in the ground going each direction and there will be a brace every 1/4 mile. How crazy do I need to get? I don’t want to do it again , but I’m going to have to bum some equipment to do a lot more.
I’m spacing my posts pretty far apart, someone told me that helps them not pull. About 7k’