Ft recovery oh | Peel top soil off and grade base for excellent drainage. 12” on high traffic areas down to about 6” on far end here. Think pad is 80’ * 250’ with bale pad on side added later. All 1” and down here rolled down in thin layers. No big 2-3” stone allowed here. Regraded every fall before bags were layed. Very little stone added since. Been here since 09 and couldn’t be happier with it. Good loader operator makes all the difference in how a stone pad holds up.