Posted 9/16/2020 20:51 (#8499664 - in reply to #8499655) Subject: RE: sand point well with windmill
Eastern central Michigan
We ended up putting a 2” sand point and pipe 20’ deep into sand gravel, gonna check in am see what we have for water in the pipe. From what I gathered Online i can put check valve and pump up top but will need to prime it if i stop using it for a period if time