I have a run where I want to bypass a damaged section of tile. So my question is can I lay the boot in a hole on the uphill side of the tile run to somehow get a "tile" depth figure and then raise to survey postion and survey the pass to the lower side and put in the hole at the "outlet" (tile) and get it to design the run to connect both end?