Madison Co. Virginia | jonas grumby - 5/23/2020 12:06
edit to add. when I hire someone to do this I would want the complete job done at basically the same time.
This is key to making it in the business, it appears. A client doesn't want to hire you for the excavator work, hire someone else for the dumptruck work, etc. You've got to be able to roll in, and get it done fast.
Here, the money team would be a good pickup, dump trailer, mini-excavator, tracked skidsteer, and a grapple bucket. This would allow smaller site prep, septic installation, storm clean-up, drain repair, etc. Once that's paying its way, a single-axle dumptruck, flatbed trailer, and a dozer/loader would be added to the arsenal. |