East Central South Dakota | spring of 2019 by ice. State wanted to close completely, but that would have basically shut down a big portion of the township. Compromised with us for vehicles only and "hug the north side". We are starting to get a slight tilt down where the pilings are missing and it is shifting the decking a little. We are compensating for the tilt by driving faster to cut down the time spent on the bridge. |