|
western iowa,by Denison | 600 yard pour-60 loads-probably pour as 1 pad with pump truck and use a self propelled laser screed-talked to a guy that would do it for $30 yard-said it would take 6 hours-he would bring his crew and laser-they do good work-said hold up usually was trucks bringing concrete-we used a pump last year on some pours with spin screed-poured a load every 5 minutes-
(001 (full).JPG)
(002 (full).JPG)
(005 (full).JPG)
(006 (full).JPG)
Attachments ---------------- 001 (full).JPG (135KB - 18 downloads) 002 (full).JPG (120KB - 23 downloads) 005 (full).JPG (122KB - 34 downloads) 006 (full).JPG (111KB - 70 downloads)
| |
|