Posted 3/26/2020 07:24 (#8139596 - in reply to #8139537) Subject: RE: Concrete
It will have a slight slope the 300’ way. Going the 150’ direction would be like working on side angle. How much grade I don’t know yet till I work on ground work this summer. And I will feed up the 300’ way so don’t think I want to be scraping across my seams. Rather go with them.