What kind of "options" should one consider in putting in a heated shop floor. Planning a U-drain drain. What about insetting a steel H beam flush with floor to weld tie downs if ever needed? Backed away from car/truck lift-not big enough space (only about 2200 sq ft usable). What other things have been done?