Posted 7/10/2019 23:38 (#7608047 - in reply to #7607680) Subject: RE: Concrete pour
Madison Co. Virginia
Powerwash it.
You're basically pouring over a well-compacted base. Don't pour any thinner than you would on a new slab. 4" minimum. Another inch or two wouldn't hurt.