|
western iowa,by Denison | concrete is the most expensive-its not the lot itself as much as driveways and feed lanes-by the time your done putting rock down your better off to just pour concrete-freight is the same cost as rock or concrete-after years of rocking lanes I made the jump and just pour-lanes-its either pay now or pave later
(063 (full).JPG)
Attachments ---------------- 063 (full).JPG (198KB - 24 downloads)
| |
|