Near Intersection of I-35 & I-90 Southern Mn. | Which Raven controller? Most can be run with an implement switch. For example on a Raven 440/450 etc. there is an orange and an orange/white wire that can be connected to an implement switch. The implement switch would need to be mounted so the circuit is completed when the rig is in the down or apply position.
Then the regular Master switch is left in the OFF position and the implement switch starts/stops application. Another switch can be placed in the loop going to the implement switch. Then if that switch is OFF, then one could lower the reig without having the flow start for parking overnight, repairs etc.
Edited by tedbear 7/8/2019 06:48
|