Posted 6/20/2019 08:52 (#7570186 - in reply to #7570005) Subject: RE: Manure pit & runoff water
SW MN - mt. lake/windom
How old of a site. Typically after construction we see settling of soil around the barn that need dirt work done to slope away from barn and around year 20 errosion and other factors cause soil to slope to barn that require reworking to slope away from barn. If no slope dig a ditch around barn to slope away.