Posted 2/12/2019 19:12 (#7316771 - in reply to #7316281) Subject: RE: Backhoe bucket for mud
Moreauville LA
The chains work, if done right.
5/8" chain, welded on back of bucket, long enough to follow inner contour of bucket and allow one link to reach over cutting edge. On a cleanout bucket, one setup every 12" is good.