AgTalk Home
AgTalk Home
Search Forums | Classifieds (22) | Skins | Language
You are logged in as a guest. ( logon | register )

Farm building.
View previous thread :: View next thread
   Forums List -> Machinery TalkMessage format
 
RockyMtn
Posted 2/6/2019 11:14 (#7301034 - in reply to #7300881)
Subject: RE: Farm building.


North East Colorado
I didn't ask about 4 foot spacing, but I don't think they would give you that option. The beams for the side walls are three 2x6's glued and screwed together. At the top of the of the beam, the middle 2x6 in the beam is cut down about 16 inches creating a pocket. The end of the roof truss fits down in between the pocket and bolted, and screwed through the beam. My Morton rep was Greg Ure here in Northeast Colorado. Cell# 970 370 8022. I will see if I have a good photo of where the roof truss and beam come together.



(028 (full).JPG)



(022 (full).JPG)



Attachments
----------------
Attachments 028 (full).JPG (126KB - 22 downloads)
Attachments 022 (full).JPG (61KB - 13 downloads)
Top of the page Bottom of the page


Jump to forum :
Search this forum
Printer friendly version
E-mail a link to this thread

(Delete cookies)