Concrete cure time?
View previous thread :: View next thread
   Forums List -> Machinery TalkMessage format
 
mschultz
Posted 7/19/2018 17:13 (#6880318 - in reply to #6880286)
Subject: RE: Concrete cure time?


Oregon
If it is warm and sunny, one should slow the rate of water loss by hydrating and covering the slab. At least, that is what we do when the heat is on out here. You want the slab to set up, not dry out. Those are two different things.

All things being equal, long cool and easy cures are better than dehydration.

I'd wait one week.


-Mike