Posted 3/31/2018 09:37 (#6677024 - in reply to #6676904)
Subject: RE: ISO Down Force Monitoring Only


Near Intersection of I-35 & I-90 Southern Mn.
Thanks for the replies, My weigh bars, cables, etc have shipped and should arrive Monday. My tractor needs a hijack adapter cable to divert or hijack the IBBC connector to my InCommand 1200 display instead of into the tractor itself. My plan is to get that installed and plug in the down force components on the floor before I actually install them on the planter. That way I can create a simple configuration to see how that goes.

I will proceed to actually install the weigh bars on 6 rows with the tee cable leading to the frame. I will also install the CAN repeater and implement switch module to tee into my CAN A implement switches. I will then be able to determine the length of the 6 extension I will need to tie the row branches altogether.

I'm a bit confused on the how the system "knows" which sensor is which and where they are. I did not need to inform the configuration of this on a PC simulator but hopefully that should be obvious when I get that far. Later