North Central Illinois | Until I can swing it on my own, I am looking at those options. Trouble is, there's a lot of acres involved.
I am almost at the top of the watershed on one side. The existing main is adequately sized for what's above me in the watershed. If I want to pattern tile all of my acres I need a dual wall 18"
Making it a district project unfortunately would mean that we'd need to size it to handle the full 900+ acres in the watershed. I have no problem sharing costs equitably this way, but it'll likely turn into an even more difficult task.
You are 100% right about, "if it's there it'll be used." I am sitting on a little more than half a mile of 12" main that's like it isn't even there for 2 weeks. Then everything above gets caught up and it does it's job fairly quickly. | |
|