|
chortitz, manitoba | You want to brace that up heavier than that. I built one that's 24"x24"x24" one inch square tubing frame with rebar crossing the openings at 3inch spacing. First time I used it (and bin empty) most of the rebar was bust off and lying over top the auger opening. Just sheer luck that none of them went into the auger and jammed it up. There's an immense amount of pressure going through, especially if unloading at half auger capacity or higher. I'll see if I can find a picture.
(IMG_20160809_143815525.jpg)
Attachments ---------------- IMG_20160809_143815525.jpg (82KB - 30 downloads)
| |
|