Posted 4/30/2017 11:56 (#5991643 - in reply to #5991578) Subject: RE: Biggest Tile Main you can get
South East IL
My bad I meant it takes a 6 in riser that long to drain the pond hard to do surface drainage they had to dig the hill out with a long stick just to put the 6in in place. the fence post sticking up marks the riser