Posted 4/10/2017 07:34 (#5955038) Subject: PJ dump trailer S L O W cycle times
I have a 20' twin cyl hoist PJ dump trailer, it is extremely slow raising/lowering. I assume it's the low gpm flow of the pump added to the fact of filling 2 cyl.
Would adding another hyd pack cut the time in half? I looked on their site they use the same pump for all trailers as far as I could ascertain.