|
Idaho | Will a Raven controler operate a Midtec motorized hyd control valve? One dealer say yes the other says "We have problems." I understand Raven signal is 5.5 v in auto and 12 in manual. Midtec is 4 lead plug requiring the following:
1. 12v continuous
2. 12v increase intermitent signal
3. 12v decrease intermitent signal
4. ground
The problem would be, I think, with the 5.5v auto signal. Do I need to set up a relay to get the 5.5v up to 12v?
UNRELATED
Waiting for the EZ 500 to arrive is as bad as waiting for a baby! | |
|