Posted 10/30/2025 08:59 (#11418242 - in reply to #11418125) Subject: RE: Ag Leader Implement Switch
Washington, IA
Thanks for the reply tedbear. I have a Raven 660 that controls my NH3 flow. Could I tie into my Raven 660 with the application rate module so that my coverage begins when I flip the master switch on my Raven?