|
| Have a 40 acre pivot I’d like to level surveyed it already roughly 7k yards to move using only a north to south slope no side fall. Plan is to be able to flood irrigate. How do you make multiple checks with different elevations same slope in the same field? Tips and tricks to help with efficiency, using fmx single receiver base station in the field.
Edited by klamath101 6/29/2025 14:16
| |
|