SC WI | Add agitation to the hot load tanks. If you have sludge left, you are leaving chem behind. Tank with single outlet add a return fitting to the opposite end of the tank with a nozzel. Center draw tank add return to both ends with a nozzel smaller than the main line.
On the 1000g if tank is plumbed for 2", put 1.5" hose barbs on the inside tank bung threads to create a jet.
This is assuming both have pumps on them. If there are no pumps, only fill the tank 3/4 full, leave hooked to the truck, and slosh it back and forth before unloading.
Edited by farmer_white 6/9/2025 07:00
| |
|