AgTalk Home
AgTalk Home
Search Forums | Classifieds | Skins | Language
You are logged in as a guest. ( logon | register )

Hot Loads - Group 15's settling out
View previous thread :: View next thread
   Forums List -> Crop TalkMessage format
 
farmer_white
Posted 6/9/2025 06:57 (#11254916 - in reply to #11254893)
Subject: RE: Hot Loads - Group 15's settling out


SC WI
Add agitation to the hot load tanks. If you have sludge left, you are leaving chem behind. Tank with single outlet add a return fitting to the opposite end of the tank with a nozzel. Center draw tank add return to both ends with a nozzel smaller than the main line.

On the 1000g if tank is plumbed for 2", put 1.5" hose barbs on the inside tank bung threads to create a jet.

This is assuming both have pumps on them. If there are no pumps, only fill the tank 3/4 full, leave hooked to the truck, and slosh it back and forth before unloading.

Edited by farmer_white 6/9/2025 07:00
Top of the page Bottom of the page


Jump to forum :
Search this forum
Printer friendly version
E-mail a link to this thread

(Delete cookies)