Posted 2/12/2024 08:35 (#10619954 - in reply to #10619749) Subject: RE: Mole plow drainage?
You would need some kind of hopper and belt feeder to achieve any capacity per day, as it needs to follow the tiling machine. The hopper which pulls behind the tiling machine sets the depth of the top of the gravel, to around 18" below the soil surface.