Douglass Kansas | LIMITED AVAILABILITY: Net metering service is available under this rider at points on the Cooperative's existing electric distribution system, located within its service area, for Customers operating Renewable Energy Resource. The net metering service is available to Customer-generators on a first-come, first-served basis until the total rated generating capability of all net metering interconnections during a calendar year equals or exceeds one percent of the Cooperative’s peak load for the previous calendar year; or until the total rated generating capability of net metering interconnections equals five percent of the Cooperative’s peak load during the previous year. Upon reaching either of these limits no further net metering service shall be available for that calendar year. This rider shall not be available for any electric service schedule allowing for resale. A Customer-generator shall have the alternative option of interconnecting renewable generation under the parallel generation provisions of the Cooperative’s rules and regulations. However, renewable Customer– generators may not change between the net metering and parallel generation rider without the prior approval of the Cooperative and the Cooperative’s power supplier, and such elections shall not be for periods less than one-year. |