AgTalk Home
AgTalk Home
Search Forums | Classifieds (7) | Skins | Language
You are logged in as a guest. ( logon | register )

Agleader intellislope question
View previous thread :: View next thread
   Forums List -> Precision TalkMessage format
 
shulerfarm
Posted 7/2/2022 08:08 (#9730422 - in reply to #9728667)
Subject: RE: Agleader intellislope question


Holly Hill, SC
No perfect way of doing it. Ag Leader is not interested in improving their product. Autotile will require a straight line positive or negative slope, so in rolling hills this will not work to maintain consistent depth. What I have done is pre rip manually and then rerun the line installing your pipe or wire. I have a 3 point hitch model. Either run in manual mode or auto tile (do not press start tile). Manually pitch the plow in the ground or have a starter hole and find your installed depth either with the depth displayed or by looking at the hanging chain. Once your happy with the depth take the hitch out of float mode and run the line. Hitch ridge to the tractor will give you a consistent depth over rolling hills.
Top of the page Bottom of the page


Jump to forum :
Search this forum
Printer friendly version
E-mail a link to this thread

(Delete cookies)