|
Manitoba | I have been working on upgrading to section control in our Hagie 2100. I have some of the components already from other applications. It is much cheaper for me to just get the fmx to do everything vs hooking up to the raven system. (Cable costs are much more to hook to the raven, the ztn75503 cable to connect to the raven is pricey! At $850 plus I still need one more). My question / concern is will it do just as good a job controlling rates as the raven? I have never had an issue with the raven but think section control worth having.
Just don’t want to end with causing more issues than I am solving because of the switch
Anything I should be concerned about going the all Trimble route?
Thanks
Martin
Edited by Oakwood 6/28/2022 12:38
| |
|