nw NC | A solar operation was installed on about 300 acres about 25 miles from here. Construction took near two years. It is on some very hilly land, typical to this area. The erosion on the site is terrible. Looks to be little was done or will be done to control it as now the panels are in the way of equipment needed to be used to grade/smooth/work soil surface for seeding.