|
NE ND | You could get two 9600s with 30 foot rigids for a lot less than 200K.
I know what you mean. I run two 8820s and and a 9650W which maybe total up to 150K total with headers and we pulled into an 80 acre field the other day next to a guy with a new Lexion and 40 ft macdon which is maybe $400K plus and were out of there probably 2.5 hrs sooner than him and he had only 80 acres left to go when we arrived. The part I struggle with is the issue of finding people to run all the crap. But for 300K, I am driven to find a way. | |
|