western iowa,by Denison | we use drip guard tin
are buildings being only 100 head and we clean bedding pak out every 3 weeks,
I looked at a mono that was 1200 feet long and 60 ft wide and he had 1000 head in it-said around $300.000 to replace the steel so yes you are looking at a lot of money if you have a big mono
best of luck its a big project
We have done a couple buildings because of a cheap run of steel and have gone to the drip guard as putting plywood down takes a lot of time and adds more weight