|
NCOhio | We put up a leg and overhead that was our previous wet bin a couple years ago. Just a drag unload without a pit. That is one thing we would change. The leg is rated at 5000 bu/hr but is closer to 4000. 15 minutes to unload and moving ahead for each hopper is not what I like. We got the FSA loan at low interest which made the project kinda justified. For 40 years left to farm I would do it. | |
|