|
| I am about ready to pour a 60x72x16 shop. From what I have read on here it would be a mistake to not insulate under the pad and run the tubes under the concrete. The concrete crew is busy and not interested in doing the insulating or running the tubes. It looks like the concrete guys will come and level the floor and then leave and I will install the insulation and tubes. So what are the rules of thumb for running tubes? How thick of insulation should I use on the floor( we are in N Iowa)? Does anyone know of a company that will sell a materials package and instructions for this job? Any other tips from those who have done this would be great. I would hate to try and save a few bucks and screw it up! Thanks donny | |
|