Andie-update on GSI bin
Wicket
Posted 11/29/2012 03:44 (#2722780)
Subject: Andie-update on GSI bin


I ended up going with the 17000 bushel bin, power sweep, floor, staircase, 7hp fan, 5hp unload, concrete and labor $1.85 a bushel.
Top of the page Bottom of the page