JD 7100 Build
ShadeTree4
Posted 10/23/2025 19:58 (#11410758 - in reply to #11410735)
Subject: RE: JD 7100 Build


I guess I may have used the wrong wording-even if singulation in the meter is good I am still seeing a substantial amount of skips. I guess if the meters aren't an issue then it's something attached to the shank causing poor emergence? A lot of these fields are no till but some see tillage; it's normally really rough because the landowner wants to do it himself and doesn't do a great job. Could the lack of level tillage be a major issue?

Edited by ShadeTree4 10/23/2025 20:08
Top of the page Bottom of the page