Operation Center - Can you do a flow timing adjust to yield data?
cyclones30
Posted 9/23/2025 08:52 (#11375608 - in reply to #11375501)
Subject: RE: Operation Center - Can you do a flow timing adjust to yield data?



Midwest

dko_scOH - 9/23/2025 07:52 Changing flow delay will help where you cross a waterway or high-yielding strip at the bottom of a slope. But I've never found a way to eliminate those spurious return to cut points. I just delete them before doing analyses. I keep a copy of the raw data, in case I ever need it.


I'd think you should be able to eliminate all of those issues if you had the settings dialed. How many take the time or have the ability to do that in the screen? Very, very few. 

Here's SMS settings for an Ag Leader monitor in beans. 





(ProcessingSettings (full).png)



Attachments
----------------
Attachments ProcessingSettings (full).png (24KB - 4 downloads)
Top of the page Bottom of the page