|
 39.48, -82.98 | Changing flow delay will help where you cross a waterway or high-yielding strip at the bottom of a slope. But I've never found a way to eliminate those spurious return to cut points. I just delete them before doing analyses. I keep a copy of the raw data, in case I ever need it. | |
|