|
SW OH | Yes, all scraps from work. 30” was used to form concrete pillars under a bridge and split in half to remove. They were also cut into 7’ lengths for easy handling. The 18” are the center of super rolls of 4 and 6” tile. Again about 7’ long. I split them with my bandsaw. I’ve never worried about water or feed getting in the ribs.
Mitchco
(IMG_0617 (full).jpeg)
(IMG_0618 (full).jpeg)
(IMG_0619 (full).jpeg)
(IMG_0620 (full).jpeg)
Attachments ----------------
IMG_0617 (full).jpeg (165KB - 10 downloads)
IMG_0618 (full).jpeg (175KB - 9 downloads)
IMG_0619 (full).jpeg (240KB - 8 downloads)
IMG_0620 (full).jpeg (243KB - 7 downloads)
| |
|