| Run the tile where it will work the best. As far as no till, buy/rent/build something to close the tile trench. Look at something made to close irrigator tracks. We built a small single gang disc that throws the dirt to the center.The longer you can let the berm settle the better. No need to work the whole field when all your trying to do is fill in the trench.
Edited by MinnesotaJoe 12/5/2016 14:36
|