AgTalk Home
AgTalk Home
Search Forums | Classifieds (77) | Skins | Language
You are logged in as a guest. ( logon | register )

Winters project working
View previous thread :: View next thread
   Forums List -> Stock TalkMessage format
 
Tractormark
Posted 5/22/2016 16:34 (#5314755)
Subject: Winters project working


Northern IN.
After 4 years of strip tilling with one tractor and planting with the second tractor in the same field and requiring two operators I had decided to combine the two into one machine. My full time job as a AG Leader gives me the opportunity to watch a lot of different operations. I am putting on 28% with the strip till at two levels. Using metering tubes there is 5 gallon at about 5" and 15 gal. at the bottom of the shank. Popup going in the row at 3 gallon. Working well so far http://youtu.be/8N-1_Y_l1go

Edited by Tractormark 5/22/2016 17:53
Top of the page Bottom of the page


Jump to forum :
Search this forum
Printer friendly version
E-mail a link to this thread

(Delete cookies)