AgTalk Home
AgTalk Home
Search Forums | Classifieds (48) | Skins | Language
You are logged in as a guest. ( logon | register )

Integra configure moving to a different Integra
View previous thread :: View next thread
   Forums List -> Precision TalkMessage format
 
farmerwalt
Posted 5/28/2015 17:09 (#4596024)
Subject: Integra configure moving to a different Integra


Clifton Kansas
We now have Agleader monitor in the combine, been using Agleader several years in tractors & sprayer to steer and record application & planting data.
I plan on using the 2 different Integra's so I can harvest wheat and plant double crop soybeans at the same time. Then swap monitor and drill wheat while harvesting fall crops that way they would have as applied back ground maps for the crop being harvested. Am I thinking correct?

We already have been using 2, one for planting the other for side-dressing corn so they both have different configuration in them for each equipment.
I know I'll have to add the combine configuration.
But how do I do this in 2 monitors and not lose any of the previous configurations or adding it manually to both?
If I backup data from #1 and restore the data into #2 monitor it erases the old configuration and data in #2 monitor.



Thanks
Walter
Top of the page Bottom of the page


Jump to forum :
Search this forum
Printer friendly version
E-mail a link to this thread

(Delete cookies)