Posted 5/28/2015 20:08 (#4596316 - in reply to #4596284) Subject: RE: Precision 20/20 with electric drives
Greensburg, IN
I learned last year of the same problem out in the field
by watching my planting maps on the Ipad. Do the same as
you backup 10-12 feet and let the swath control start the
Vdives at the correct place. Some how it should start faster
by changing some settings. Going to call PP tomorrow for
their recs.